Currently, most companies serving the defense sector have only a minimal ability to actively manage deliverables. The exception to this rule would be a higher tier contractor delivering a major end item like an engine, a control surface, or landing gear. |
In this article, we will discuss how DPAS can actually help you compete for defense program dollars. We will also address how the right functionality in enterprise software including enterprise resource planning (ERP), enterprise asset management (EAM,) and maintenance repair and overhaul (MRO) can help you succeed.
Background
This piece of legislation made the U.S. Department of Commerce responsible for ensuring that critical materiel acquired by the military arrives within the time allotted. There are a number of priority ratings, with the DX rating being the highest, and requiring presidential approval. The secretary of defense, meanwhile, must approve the DL rating. However, more often than not, DPAS functions more like a classification system, with, for instance, A1 for aircraft, A3 for ships, and other designations that do not really affect priority but rather describe where the materiel resides.
Whether you are a primary contractor working directly for a branch of the military, a subcontractor working for a prime, or a second or third tier contractor or vendor, there are four main provisions of DPAS that require your attention.
Mandatory Acceptance
A contractor, subcontractor, or supplier shall accept a rated order when:
- They make the item
- Normal terms of sale apply
- They can meet delivery dates required in the contract
Mandatory Extension
Contractors are responsible for extending the received rating to their suppliers to obtain items needed to fill rated orders or to obtain replacements of inventoried items. What this means is that second and third tier suppliers can also benefit from sophisticated technology to help them comply with DPAS ratings.
Priority Scheduling
Scheduling of operations, including the acquisition of all needed production items, shall be to satisfy the delivery requirements of each rated order.
Customer Notification Requirements
A rated order shall be accepted or rejected, in writing, within 15 working days for DL rated orders and 10 days for DX rated orders.
What it Means
This has real implications for enterprise software used in the aerospace and defense industry because it is mandatory to be able to follow each prioritized item throughout a manufacturing or maintenance process. Consider the example of a compression section on an aircraft engine. As that engine goes through a refit, the vendor for each component must be able to understand the priority placed on that component. If necessary, they may need to compress the critical path of steps necessary to get that aircraft back in operation.
Therefore, when you, as a vendor, receive a PO with a DPAS rating or a priority, you need to be able to follow the requirements placed upon them. If it is a DL, you have 15 days to come back and state that you can complete that order within the specified period. The more rapidly and reliably your company completes this task, the more favorably the Defense Contract Management Agency (DCMA), which is responsible for making sure the rating system is followed, will look upon you. DCMA actually has a grading system, and as vendors and contractors perform well, are responsive and accurate in following the DPAS rating requirements, those vendors receive preferential treatment for future opportunities.
Currently, most companies serving the defense sector have only a minimal ability to actively manage deliverables. The exception to this rule would be a higher tier contractor delivering a major end item like an engine, a control surface, or landing gear. These companies are often large enough and have sophisticated enough systems to track parts, availability, and deliverability on a very granular level, at least within their own organization.
Availability of strong DPAS functionality is harder to find among middle market companies and among maintenance repair and overhaul (MRO) contractors.
In a sophisticated and complex MRO environment, where there is a requirement to have a serialized structure for every bolt, nut, and component, your enterprise software needs are much harder to meet than a standard aerospace and defense manufacturer. The MRO shop really needs an enterprise software application designed for DPAS in the MRO environment rather than a straightforward manufacturing environment. This is very difficult to find.
Even middle tier manufacturers, though, may have a hard time finding a system that can handle DPAS requirements without modifications, particularly one that is affordable, comparatively simple to implement and agile enough to handle a fast-changing program-driven manufacturing environment.
Mid-tier suppliers to the large weapons system contractors can really leverage this, particularly if you are getting into performance-based logistics (PBL) contracts, or other delivery systems where there are significant financial incentives for meeting a schedule. DPAS functionality in enterprise software can not only help you conform to DPAS requirements, but can in general help you prove your ability to avoid delaying a project in any deadline-sensitive environment.
Selecting the Right Software
The enterprise software industry can be a cutthroat business, and there is no shortage of vendors willing to represent that they have functionality that they cannot fully deliver. There are a few specific traits you can look for – in the software that you evaluate – to ensure that it will help you with DPAS ratings.
DPAS ratings are driven by regulation, but when handled skillfully through enterprise technology, can be turned into a competitive advantage in the market. |
The single most important factor is the ability to peg individual parts, activities, and processes back to that DPAS contract requirement reliably and without fail. This requires a well-integrated system that is not dependent upon human intervention or customized report but rather a native functional system that allows you to know and demonstrate that you have reliable pegging back to the contract. One advantage of IFS Applications is that it does allow you to achieve this consistent pegging perfectly every time.
So when viewing a software demo, it is important to ask the sales team to absolutely convince you that you are seeing hard pegging and not a customized report. Because that report it is not something that occurs at the instant you write your purchase order or at the end of an MRP (materials requirement planning) run. When you have real hard pegging, you have pegging back to that order regardless of whether you did something by MRP or you created the purchase order on the fly. You need functionality that without any human intervention links that activity back to that DPAS flowdown.
In a demo, it is important to ask a vendor to create a purchase order and show you how it picks up the DPAS flow down. Ask them to run something through MRP as well and do the same. Make sure you do some testing to see where the system shows you the original order, how it pegged it back to the contract, and how that contract information truly flowed all the way down to the purchase order level.
Needing a Solution
The ability to conform to DPAS ratings is important, but the end result ought to be not simple compliance – but increased competitiveness. On a technical level, what is required is an application built around a serialized structure tying together the individual part, the DPAS priority, condition code, shelf life and other factors that can have a contractual impact on a prime contractor. The ability to do this successfully and demonstrate DPAS capabilities to potential upstream supply chain partners and customers will separate the mid-tier company that can truly deliver from those that cannot.
A company with well-developed DPAS capability can position this to potential customers as one more way they can actually help them, in turn, win more federal government contracts.
Federal budget realities mean there will be fewer large procurements, so these factors are critical when it comes to the ability to secure contracts. This makes it more important than ever for these primes to manage relationships with their subcontractors. In addition, one way for subcontractors to secure more business with primes is to, in turn, prove they are a low risk choice. They have a history of meeting DPAS requirements and documented systems to ensure that this will continue into the future.
This can be particularly true when projects require long lead-time items like titanium and certain carbon composites. It used to be that the government was in a position to proactively buy up a lot of the titanium up front and keep it in reserve for defense needs. That is less the case than in past years, so on projects with materials constraints, DPAS ratings will be more and more of a factor then they have been in the past.
Conclusion
DPAS ratings are driven by regulation, but when handled skillfully through enterprise technology, can be turned into a competitive advantage in the market. Selecting the right enterprise software is a challenge though, and care must be taken to ensure that a vendor is not overstating the capabilities of the software they are trying to sell. Asking hard questions and taking a show me approach will help you arrive at a software choice that will deliver this competitive advantage.
IFS North America
Itasca, IL
ifsworld.com
Gary Cornell is implementation manager for IFS North America, as well as product line manager for the IFS Defense Manufacturing Extension (DME). He has worked for an armaments manufacturer serving the DoD for 26 years, and has been with IFS for 10 years. He holds a Bachelor degree in Mechanical Engineering from Clarkson University.
Kevin Deal is vice president for aerospace and defense at IFS North America. Previously, he has held management positions at Broadvision, Cincom, and The Greentree Group. Deal holds a Master of Science in Administration from Central Michigan University and a Bachelor degree in Mechanical Engineering from Wright State University.
Explore the June July 2012 Issue
Check out more from this issue and find your next story to read.
Latest from Aerospace Manufacturing and Design
- Piper Aircraft Inc. achieves AS9100 Certification
- Kyocera SGS' KGZ precision cut-off solutions
- Bridging the Skills Gap: A Solution for Today’s Labor Shortage
- Molex to acquire AirBorn
- Nano Dimension's Exa 250vx digital light processing (DLP) 3D printer
- IMTS 2024 Booth Tour: Fagor Automation Corp.
- How Robotics and Automation are Transforming Manufacturing
- Wichita State’s NIAR delivers fiber metal laminate test panel to FAA